2 Storey Residential with Roof Deck Architectural project plan DWG file

2 Storey Residential with Roof Deck Architectural project plan DWG file
Profile

Uploaded by:

Joel

Estrada

Description
2 Storey Residential with roof deck such as ground Floor Plan included Reflected Ceiling Plan, kitchen dining area,car parking,Floor Finish layout,second floor plan included 3 bedroom with attached toilet,staircase,terrace,open below, four side Sections and four side Elevations .this project with drawing for DWG file
Profile

Uploaded by:

Joel

Estrada

find Latest

Related Files

WhatsApp Chat