Sports center architecture project. RAILYARD, PLATFORM OF LOADING AND DOWNLOADING, CAMERA LATER, STORE FOR 14 DAYS. TOTAL 56 TONNES, PROPULSOR OF COMPRESSED AIR. elevation & section with lay-out detail.
Four level stadium archite
Club house plan detail dwg
22x32m basketball court pl
The oval pool plan detail
Specification and notes de
Sports center elevation an
Sport center landscape vie
Football stadium plan
Sport Center design cad dr
Fitness equipment design f
Sports Complex cad drawing
Plan of playing area with