Modern House Project Plan with Elevations and 3D Exterior Views

Modern House Project Plan with Elevations and 3D Exterior Views
Profile

Uploaded by:

Prommin

Warawongkitti

Description

This modern house project AutoCAD DWG file provides a complete architectural presentation, including front elevation, rear elevation, sectional views, interior renderings, and 3D exterior perspectives. The drawings highlight the structural composition of a two-storey modern residence, featuring balcony details, door and window alignment, parapet height markings, and boundary wall design. The uploaded layout also showcases interior visualization images displaying the living room, workstation area, lighting arrangements, wall textures, and ceiling treatments. Exterior 3D views capture daytime and nighttime renders, giving a complete visual understanding of the façade, driveway, landscape elements, and fence layout.

The section view clearly illustrates floor-to-floor height distribution, stair placement, roof slab elevation, and the architectural symmetry maintained throughout the building design. The façade includes modern cladding textures, shading elements, and proportioned openings that enhance the overall visual appeal. This DWG file is ideal for architects, interior designers, civil engineers, and home builders aiming to create a modern residential project with accurate detailing. The drawing can be used directly in AutoCAD, Revit, SketchUp, or 3ds Max, making it a valuable reference for planning, visualization, and construction documentation. Unlocking this file with a Cadbull subscription provides access to high-quality architectural design content.

Profile

Uploaded by:

Prommin

Warawongkitti

find Latest

Related Files

WhatsApp Chat